Case study: Combined gas and water upgrades, De Trafford Drive, Wigan

Add Your Heading Text Here

Overview of works

Network Plus leads a regional first for combined gas (Cadent) and water (United Utilities) upgrades, coordinating two essential utility projects – replacement of ageing infrastructure – into a single programme of works and reducing the impact on local residents and the community by four weeks.

The De Trafford scheme provides a compelling, practical blueprint for the future of infrastructure delivery, with the potential to drive transformational change across the industry.

Key challenges

  • Traditional ways of working – joint working historically undertaken chronologically rather than concurrently
  • Human resources – availability of appropriately qualified operatives
  • Community impact – minimising disruption to customers, communities and road users
  • Environmental impact – limiting excavation and site activity
  • Client expectations – completing on time and delivering identifiable operational efficiencies

Our approach

  • Coordination – project centrally managed by Network Plus, providing a single point of control for planning, safety, delivery and communications
  • Integration – remove the need for multiple contractors or handovers by engaging
  • PGL Pipelines, whose engineers hold the dual competencies and safety accreditations required to work on both gas and water networks 
  • Collaboration – driving effective communication between utility companies and the local authority, and engagement with local residents
  • Future-proofing – supporting long-term resilience and the transition to lower-carbon energy

Outcomes

  • Disruption reduced by  four weeks
  • No road closures or temporary traffic lights required during works
  • Access to homes was maintained throughout the works 
  • Customers now benefit from modern, resilient infrastructure, reducing the likelihood of future leaks, bursts and unplanned interruptions to supply.
  • Efficiency – reduced duplication of excavation, reinstatement and traffic management delivers significant savings
  • Productivity – enhanced through shared resources and integrated delivery, with more efficient use of labour, plant and materials
  • Environmental benefits – fewer excavations, reducing material usage and waste, and lower carbon emissions due to reduced plant utilisation and shorter programme

Summary

The De Trafford scheme has created a blueprint for collaborative infrastructure delivery. Network Plus is already supporting both utilities in identifying further opportunities across the region and the project has been shortlisted for an industry award.