Overview of works
Network Plus leads a regional first for combined gas (Cadent) and water (United Utilities) upgrades, coordinating two essential utility projects – replacement of ageing infrastructure – into a single programme of works and reducing the impact on local residents and the community by four weeks.
The De Trafford scheme provides a compelling, practical blueprint for the future of infrastructure delivery, with the potential to drive transformational change across the industry.
Key challenges
- Traditional ways of working – joint working historically undertaken chronologically rather than concurrently
- Human resources – availability of appropriately qualified operatives
- Community impact – minimising disruption to customers, communities and road users
- Environmental impact – limiting excavation and site activity
- Client expectations – completing on time and delivering identifiable operational efficiencies
Our approach
- Coordination – project centrally managed by Network Plus, providing a single point of control for planning, safety, delivery and communications
- Integration – remove the need for multiple contractors or handovers by engaging
- PGL Pipelines, whose engineers hold the dual competencies and safety accreditations required to work on both gas and water networks
- Collaboration – driving effective communication between utility companies and the local authority, and engagement with local residents
- Future-proofing – supporting long-term resilience and the transition to lower-carbon energy
Outcomes
- Disruption reduced by four weeks
- No road closures or temporary traffic lights required during works
- Access to homes was maintained throughout the works
- Customers now benefit from modern, resilient infrastructure, reducing the likelihood of future leaks, bursts and unplanned interruptions to supply.
- Efficiency – reduced duplication of excavation, reinstatement and traffic management delivers significant savings
- Productivity – enhanced through shared resources and integrated delivery, with more efficient use of labour, plant and materials
- Environmental benefits – fewer excavations, reducing material usage and waste, and lower carbon emissions due to reduced plant utilisation and shorter programme
Summary
The De Trafford scheme has created a blueprint for collaborative infrastructure delivery. Network Plus is already supporting both utilities in identifying further opportunities across the region and the project has been shortlisted for an industry award.